The MEECE project would like to place cookies on your computer. To find out more about the cookies, see our privacy notice.

MEECE
  • About the project
  • Project partners
  • Research Highlights
  • Knowledge Transfer and Dissemination
  •  Contacts  
  • Home
  • Work Packages »
    • WP1
    • WP2
    • WP3
    • WP4
    • WP5
    • WP6
  • Model Library »
    • OSMOSE
    • ERSEM
    • SLAM/SPAN
    • SMS
  • Fact Sheets
  • Datasets
  • Regions of Study
  • Meetings/Workshops
  • Stakeholders Database
  • Deliverables
  • Reporting
  • Project Documents
  • Newsletter
  • Summer school 2011
  • MEECE Blog
  • indiSeas
  • Jobs
  • Links
  • Calendar


Join the MEECE
mailing list

WP2 Deliverables

Deliverables (brief description and month of delivery)
D2.1: Report on system specific key species, feedbacks and forcings (M9, UHAM)
D2.2: Sub-model acidification-sensitive calcification rate, including user guide. (M9, PML)
D2.3: Sub -model OSMOSE, functional coupling with plankton models (M9, IRD)
D2.4: Sub -model APECOSM functional coupling with plankton models (M9, IRD)
D2.5: Sub -model Carbon Phytoplankton including user guide, updated November 2010 (M12, UiB)
D2.6: Sub -model SMS including user guide (M12, DTU-AQUA)
D2.7: Workshop including user guide and report outlining validation methodology (M12,PML)
D2.8: Sub -model ECOSIM ECOPATH including user guide (M15, CEFAS)
D2.9: Sub -model of coccolithophore (E. huxleyi), including user guide, updated November 2010 (NOCS) (M15, NOCS)
D2.10: Sub -model copepod structured population model including user guide (M18, UHAM)
D2.11: Sub -model Library of IBM sub-models including user guide (M18, UHAM)
D2.12: Sub -model Ecotoxicology: including user guide (M30, UHAM)
D2.13: Sub -model Alien invasive species including user guide (M30, PML)
D2.14: Users guide and report for models in the MEECE library (BB UHAM) (M36, BB)

All partners are required to inform the knowledge transfer team (WP6) of important results and conclusions. The primary mechanism for this will be the annual project meeting and subsequent reporting.

Workshops Milestones

4: Resolving system specific key species, feedbacks and forcing workshop M3
8: Joint meeting with WP’s 3 to 5 Status meeting on advances in module coupling and validation M12
13: Joint meeting with WP1 Advances in model parameterisation (WP1 report, WP2 report) M16
15: Joint meeting with WP’s 3 to 5 Status meeting on advances in module coupling. M18
17: Joint meeting with WP1 Advances in model parameterisation M23
20: Status meeting on advances in module coupling (with WP3 & 4) M28
24: Joint meeting with WP1 Advances in model parameterisation M32
27: Joint meeting with WP’s 3 to 5 Status meeting on advances in module coupling. M35

European Project supported within Theme 6 Environment of the Seventh Framework Programme for Research and Technological Development
© 2010 by MEECE Webmaster